Iváncsa
Construction and trial operation of the permanent wastewater treatment plant of the Iváncsa Industrial Park. The 4,000 m3/day plant also treats industrial wastewater from an EV battery factory.

Project overview
Treatment capacity
4 000
m3/day
Population equivalent
10 000
PE
Our role
As general subcontractor, we carried out the permit and detailed design, the construction, mechanical and electrical works within the site, supply and installation of the equipment, and the trial operation.
01
The client
The client was the Municipality of Iváncsa. The plant is operated by DRV Zrt..
02
What we did
We delivered all works within the site (as a “small general contractor”), from design to trial operation. Besides the industrial park's wastewater, the plant also treats industrial wastewater from an EV battery factory. We delivered this project in collaboration with our sister company, INWATECH Ltd.