Iváncsa

Construction and trial operation of the temporary wastewater treatment plant of the Iváncsa Industrial Park. The 4,000 m3/day plant also treats industrial wastewater from an EV battery factory.

Iváncsa

Project overview

Treatment capacity

4 000

m3/day

Population equivalent

10 000

PE

Our role

As general subcontractor, we carried out the permit and detailed design, the construction, mechanical and electrical works within the site, supply and installation of the equipment, and the trial operation.

01

The client

The client was the Municipality of Iváncsa. The plant is operated by DRV Zrt..

02

What we did

We delivered all works within the site (as a “small general contractor”), from design to trial operation. Besides the industrial park's wastewater, the plant also treats industrial wastewater from an EV battery factory. We delivered this project in collaboration with our sister company, INWATECH Ltd.