Kisköre
Energy savings at TRV Zrt.'s wastewater treatment plant in Kisköre through program-level optimisation of aeration.
Project overview
Energy savings
>20
%
Savings
~3 900
kWh/month
Our role
Installation, maintenance, monitoring and remote supervision for the program-level optimisation of aeration.
01
The client
Our client was TRV Zrt., a utility company; the project is being carried out at the Kisköre wastewater treatment plant.
02
What we did
Since 2023 we have been optimising aeration on the biological line of the roughly 900 m3/day plant with an Aqualogic (Binder) system. Setting the savings baseline was a unique task: from short-term measurements of blower energy use, we estimated aeration's share of the plant's total consumption and had the resulting baseline values accepted.
Outcome
Over two and a half years, the client has saved around HUF 4 million.