MOL – TVK

Design and construction of a new SSBR wastewater pre-treatment flotation system, including chemical dosing equipment. Full delivery, complete with on-site construction and electrical installation work.

MOL – TVK

Project overview

Treatment capacity

7 200

m3/day

Our role

Our sister company, INWATECH Ltd., handled the design, on-site installation and trial operation. We took over the reference from our sister company when Water4All was founded in 2021 and took on the industrial segment.

01

The client

MOL Petrolkémia Zrt. is one of Hungary's largest chemical companies. Its integrated petrochemical complex in Tiszaújváros comprises two olefin plants and five polymer plants and has supplied polymer products to Hungarian and European plastics processors since 1970.

02

The facility

The new SSBR wastewater pre-treatment flotation system, including the chemical dosing equipment, was built for a capacity of 7,200 m3/day. The project covered complete supply, on-site construction and electrical installation. We took over the reference from our sister company when Water4All was founded in 2021 and took on the industrial segment.