Samsung SDI

Refurbishment of the industrial wastewater treatment plant at Samsung SDI's Göd site, including modernisation of the entire stormwater drainage system (K-Project, phase 1).

Samsung SDI

Project overview

Treatment capacity

1 850

m3/day

Population equivalent

~3 000

PE

Our role

Our sister company, INWATECH Ltd., acted as main contractor, handling permitting and implementation and running the trial operation.

01

The client

Samsung SDI Hungary has operated in Göd since 2001. Construction of its electric vehicle battery plant on the site began in 2016, and the Göd plant has become Samsung SDI's most important European production base.

02

The facility

In the first phase of the K-Project, the existing industrial wastewater treatment plant was refurbished and the site's entire stormwater drainage system was modernised. We took over the reference from our sister company when Water4All was founded in 2021 and took on the industrial segment.